Data Centres

Data Centres

Fujitsu Data Centre Perth

Ian has been involved with several minor upgrades for Fujitsu Data centre on Murray Street in Perth CBD. These included increasing the air conditioning, single point of failure analysis and survey of capacities for possible Fujitsu tenants.

Fujitsu Data Centre Malaga

Ian was the internal reviewer for the design of the Tier 4 upgrade to Fujitsu Data Centre in Malaga during the period where the Tier 4 upgrade design was being performed. Ian has experience in Data centre design around the world and worked with the installation contractor to achieve a compliant Uptime Institute Tier 4 design.

National Broadband Network

James was the Lead Services Engineer for three primary NBN nodes in WA and SA. Works included fully redundant Mechanical, Electrical, Fire and hydraulics services.

Karara Mining Central Control Room

James was responsible for the internal fit out of the main Plant Control Room at Roy Hill including redundant power and cooling systems.

Roy Hill Central Control Room

Lead designer for the on-site Central Plant Control Room that controlled the entire Ore Handling Plant. In addition to the design James was responsible for the coordination of the installation of the building with the wider plant fibre and power network.

Uptime Institute

James has been the Lead Mechanical Engineer for multiple Master Planning, Tier Gap Analyses, Feasibility Studies and Certified Uptime Institute Designs to Tier III and Tier IV. James worked on the first Colocation Data Centre to be awarded Tier IV in Australia. Data Centre projects are subject to strict confidentiality, therefore only the project names are listed below:

  • Fujitsu Data Centres WA, NSW & VIC
  • Equinix Shenton Park, WA
  • Equinix SY1 & SY2, Mascot NSW
  • IBM Data Centre, Perth WA
  • UWA Data Centre, WA
  • Landgate Data Centre, Midland WA
  • Quadrant Energy Data Centre, Perth WA
  • Apple Data Centre, China
  • CBA Disaster Recovery Centre, WA